CURRENT PROJECT - OCTOBER 2014 START - UPPER MILLCREEK AREA - Second level master suite conversion from bedroom, bathroom, and loft area.
CURRENT PROJECT - OCTOBER 2014 START - MURRAY - Complete 2200 SF+ basement finish out.
CURRENT PROJECT - HARVARD YALE AREA - Complete basement remodel to include 2 bedrooms, new bath, family room, laundry room, heated floors.
CURRENT PROJECT - Downtown Loft SLC - Complete new upper level & stairs to include new fossilized 5" bamboo floors & stairs, bar area, eco-smart fireplace burner, remodeled master bedroom & bath.
COMPLETED - SLC - Complete main floor bath redo.
COMPLETED - Copperton - Complete main floor bath reconfiguration & redo.
COMPLETED - HARVARD YALE AREA - New 2 car detached oversize garage to match home. 10' x 24' garage attic storage.
COMPLETED - INDIAN HILLS AREA - Complete hi-rise condo remodel. Raise ceiling height, remove walls, reconfigure kitchen, new baths, new fireplace, hardwood floors, and much more.
COMPLETED - EAST BENCH AREA - New two car detached garage with outdoor entertaining area on top, accessible from home. New master suite with indoor/outdoor fireplace and a new swimming pool to follow.
COMPLETED - UPPER SUGARHOUSE AREA - Jan. 2013 New, more open kitchen, french doors to front porch in living room, complete new main floor bath, and a lot more fun stuff.
COMPLETED - UPPER HARVARD YALE AREA - Small addition to back of home for new master bath. Master shower to feature Kohler's state of the art DTV II shower experience complete with integrated sound system. Roof & minor reconfiguration of basement & main level walls.
COMPLETED - EMIGRATION PLACE - New home in Emigration Canyon, Salt Lake City, Utah.
COMPLETED - HARVARD YALE AREA - Main floor remodel to include complete new main floor bath, master closet reconfiguration, electrical system update, plumbing, insulated interior walls & other energy savings updates.
COMPLETED - OLD MILL ESTATES - New stamped concrete area in rear yard. Stone walls & planting area, stone gas firepit, new deck & landscaping.
COMPLETED - BENCHMARK SUBDIVISION - New 2000 square foot master bedroom addition. New addition will be built on adjacent lot next to home. Modern design to match existing home. Lots of glass, skylights, soaring rooflines, decks and an unobstructed city view!!!
COMPLETED - HARVARD YALE AREA - Complete garage reconstruction to include 88 square foot addition on rear and new roof with second story storage.
COMPLETED - HARVARD YALE AREA - Basement remodel to include familyroom, bedroom, bath, laundry & storage.
COMPLETED - EAST SUGARHOUSE - Complete home remodel with new master bedroom suite, family room, and detached garage.
COMPLETED - EAST MILLCREEK - 2200 square foot basement buildout including gaming room, media entertainment room, card room, bar, bathroom and bedroom.
COMPLETED - HARVARD AVE. - New two level garage to be followed by rear home addition.
COMPLETED - INTERIOR REMODEL - HARVARD YALE AREA - Interior remodel of living room, dining, kitchen, stairway, basement family room & bar.
COMPLETED - FOOTHILL AREA - Total interior remodel & addition of master bedroom suite.
COMPLETED - 900 SOUTH - Project included a 16'X 26' addition to basement, main, and second level. Office addition over east driveway as well.
COMPLETED - Greenwood Terrace - Harvard/Yale Area - Complete gut and rebuild of entire home. New garage, new basement, new main floor with addition, new second level.
COMPLETED - Sugarhouse Area - Master Bed/Bath,Laundry Room & Basement Addition. Exterior/Interior update)
COMPLETED - Diestel Road - Check out all of the photos in the "Major Projects" section of the "Project Portfolio"
COMPLETED - Marabow (Holladay) - New kitchen/family room area, extended dining room.
COMPLETED - Island Drive. (Bill's Island - Island Park, Idaho) - New home, away from home.
Remodeling and Home Design



profile  |   portfolio  |   remodeling tips  |   current projects




Kim Crellin - Tel. 801-557-1002
e-mail inquiry: kim@markimconstruction.com
Copyright © 2003-2014 Markim Construction, LLC