Choose from the following projects:

Millcreek Area Basement Remodel

Complete remodel of basement. The original basement was not finished when the home was constructed in 2007. The new basement consists of a gaming room, a pool room, a state of the art home theater room, a poker table area, a wet bar, a new bedroom with walk-in closet and laundry facilities, and a new 3/4 bath.

Harvard Yale Basement Remodel

Complete remodel of basement. The original basement consisted of a family room with the rest being unfinished. The heating/air conditioning systems, plumbing & electrical were all replaced. The end result was a remodeled family room with an open stairway to create a larger, more comfortable space, a new bedroom with new egress window, a new bath, laundry room and a storage area.

Foothill Basement Remodel

Complete remodel of basement. The basic layout of the rooms was kept the same with the exception of closet space & entrance configurations. The mechanical room was relocated, eliminating the two foot hallway leading from one end of the basement to the other. The heating/air conditioning systems, plumbing & electrical were all replaced.

Harvard/Yale remodel

This basement was completely gutted and re-constructed with the same layout as before. New walls were framed to provide space for insulation, electrical, plumbing and multi media hookups. The family room was enlarged by four feet in order to accomodate the intended furniture for the room. This space was taken from the original stairway. A new stairway was constructed in a different area of the home.

Harvard/Yale remodel

This basement was completely gutted and re-constructed. New walls were framed to provide space for insulation, electrical and plumbing. The owners moved their master bedroom to this basement. A new bath was constructed with a full sized bath and a walk in shower seperated by glass block.

Harvard/Yale remodel

This basement was completely gutted and re-constructed. New walls were framed to provide space for insulation, electrical and plumbing. Over 1/2 of the basement area was constructed as an apartment with one bedroom, one bath, a kitchen/living room combination, and an area for the stack washer & dryer.

Harvard/Yale remodel

This basement was left ready to complete when we remodeled the home a few years ago. We had framed all of the exterior walls and placed heat runs and plumbing lines where we thought they should go. A large family room was added with two enlarged windows and built-ins along one wall. A steam bath was added along with an additional guest bedroom and crafts room.






profile  |   portfolio  |   remodeling tips  |   current projects




Kim Crellin - Tel. 801-557-1002
e-mail inquiry: kim@markimconstruction.com
Copyright © 2003-2024 Markim Construction, LLC