![](img/top_left.gif)
|
![](img/top_right.gif)
![](img/areas_template.gif)
![](img/blank.gif) |
![](img/MarkimLogoFull.jpg)
No before picture avail.
|
![](img/MorganPool1.jpg)
A view of the pool and the game room addition. The game room was sided
with the same cedar shingles as the roof areas.
![](img/MorganPool2.jpg)
Another view of the pool.
![](img/MorganPool3.jpg)
View of pool with new pool equipment and bathroom building in the
background.
![](img/MorganEaves.jpg)
View of soffits and fascia work.
![](img/MorganFront.jpg)
The roof was completely replaced. The three upper story windows were given
pitched roofs and were re-built. New #1 cedar shingles were installed on the
entire roof with 4 inch spacing. All soffits, fascias, and exterior mouldings were
milled to match the original. Copper flashings, drip edges, valley metal and raingutters
were used to complete the project.
![](img/YaleGarage.jpg)
This new garage replaced the old garage that was failing structurally.
The new garage has an attached bathroom serving the pool and a large
pool equipment room.
|
|
|