|
|
No before picture avail.
|
A view of the pool and the game room addition. The game room was sided
with the same cedar shingles as the roof areas.
Another view of the pool.
View of pool with new pool equipment and bathroom building in the
background.
View of soffits and fascia work.
The roof was completely replaced. The three upper story windows were given
pitched roofs and were re-built. New #1 cedar shingles were installed on the
entire roof with 4 inch spacing. All soffits, fascias, and exterior mouldings were
milled to match the original. Copper flashings, drip edges, valley metal and raingutters
were used to complete the project.
This new garage replaced the old garage that was failing structurally.
The new garage has an attached bathroom serving the pool and a large
pool equipment room.
|
|
|