before

before

before

before

The new garage has been framed and being prepared for stucco.


View from the west side. A new covered roof area will be built over the side door.


Attic storage area above garage.


Main garage area showing framed stairway to attic storage.




profile  |   portfolio  |   remodeling tips  |   current projects




Kim Crellin - Tel. 801-557-1002
e-mail inquiry: kim@markimconstruction.com
Copyright © 2003-2024 Markim Construction, LLC